From Purchase to Completion
Frequently Asked Questions About Installation
Signing the contract for your greenhouse isn’t the end of the journey; it’s the beginning of our master craftsmen bringing your structure to life.
Find answers to our frequently asked questions here, covering what you can expect before, during, and after your new greenhouse is installed.
Before installation
How long after purchase will my greenhouse be installed?
Can I choose the installation date?
Can I reschedule the installation date?
If you need to reschedule your installation then get in touch and we’ll do our best to accommodate you. Changes may require your installation to be cancelled and re-booked, which may result in an extended waiting period due to our installers being booked out on other projects.
Is the price on my contract fully inclusive, or will there be additional charges throughout the installation?
When must the base be built?
The base, constructed by a builder of your choosing, must be completed prior to your agreed installation date. We recommend having the base completed at least two weeks in advance of your greenhouse installation, as it needs to fully signed off by your builder and final measurements sent to us.
How do I ensure the base is constructed correctly?
If I’m having gas, water, or electrics fitted, when must these be completed?
Can I use my own installer or build the greenhouse myself?
Can you dismantle and remove my old greenhouse?
Any existing greenhouse or garden structure should ideally be removed before placing your order, and must be removed before your builder measures the base. This ensures the base is fully exposed so accurate dimensions, diagonals and levels can be taken. If you would like independent verification, Hampton offers a professional survey service, at an additional cost, where one of our experienced surveyors will inspect and measure the exposed base to confirm its suitability for your new greenhouse.
Will the base of a previous greenhouse be suitable for my new Hampton greenhouse?
Possibly, but you should never assume that an existing base will be suitable for a new Hampton greenhouse.
The first step is for your builder to provide us with accurate measurements of the existing base, including its overall dimensions, diagonals and levels. Our technical team will then assess whether the base is compatible with one of our standard greenhouse models. If it isn’t, don’t worry – Hampton also specialises in designing and manufacturing bespoke greenhouses, allowing us to create a building that is tailored precisely to your existing base or available space.
Should the existing base be suitable, your builder will be required to complete and sign our base verification document before installation can proceed. If you would prefer independent verification, Hampton also offers a professional survey service, at an additional cost, where one of our experienced surveyors will inspect and measure the existing base on your behalf.
Is the greenhouse insured from transit to completion?
The Hampton team is fully liable for your greenhouse throughout transit and installation, and we take every step to ensure that your new greenhouse is fully protected from the moment it leaves our factory. Until you take full ownership of the greenhouse after installation, in the highly unlikely event of damage or defect, it is Hampton’s responsibility to make good.
Are the installers Hampton employees or subcontractors?
Every Hampton greenhouse is installed by experienced fitters who have been trained and approved by Hampton. Whether employed directly by Hampton or working as part of our approved installation network, every installer follows our proven installation methods and works to the same exacting quality standards, ensuring your greenhouse is installed with the care and precision for which Hampton is renowned.
During installation
How many days will the installers be on-site?
What are the installer’s working hours?
Our installers usually work between 07:00 and 18:00, but this may vary slightly depending on your location. If you need to amend our installer’s usual working hours, please discuss this with our contracts team as early as possible.
Do I need to be home while the installers are working?
How wide does the garden access need to be?
How will your team protect my existing garden landscaping during the build?
Who will be my main point of contact on-site?
Who should I contact if I am unhappy with any aspect of the build process?
What are the installation team's requirements for on-site facilities?
Can adverse weather disrupt the installation process?
Does your team handle project waste, or is a skip required?
Do I need to keep pets secured while the installation is underway?
What happens if a component is damaged during delivery or installation?
After installation